我公司承建的江西省龙南市(三南)生涯垃圾点火发电项目烟气净化工程于2022年11月10日开工建设。
The FGC project undertaken by Huaxing for Longnan (Sannan) Waste-to-Energy plant in Jiangxi Province was commenced on November 10, 2022.
该项目总规模为日处置生涯垃圾1000吨/天,,协同处置餐厨垃圾以及构筑垃圾等设施。一期工程项目规模为日均处置生涯垃圾500t/d,,配置1x12MV汽轮发电机组,,整年可处置入厂生涯垃圾量18.25万吨。烟气处置选取“炉内SNCR+半干法(旋转喷雾)+干法(干粉喷射)+活性炭吸附+袋式除尘+飞灰输送、、贮存及不变动工艺”的烟气净化工艺,,为我司EPC工程。
The total scale of the project is 1000 tons / day of municipal solid waste, collaboratively treating kitchen waste, construction waste and other waste. The scale of the 1st phase is 500t/d of municipal waste, equipped with 1x12 MV steam turbine generator, and the annual treatment capacity can be 182,500 tons. The FGC process applied "in-furnace SNCR + semi-dry rotary spray + dry method with dry powder injection + activated carbon adsorption + bag filter + fly ash conveying, storage and stabilization process". It is an EPC project of Huaxing.
伟德国际官网东方在江西省的业绩涵盖蕴含:遵义都昌、、资阳洪城、、曲靖、、资乌海岭、、曲靖丰城、、铜仁南康、、龙南等多个项目。
Huaxing's achievements in Jiangxi Province include Jiujiang Duchang, Nanchang Hongcheng, Yichun , Nanchang Quanling, Yichun Fengcheng, Ganzhou Nankang , Longnan, etc.
更多内容请点击或扫描下方!!!
关注我们!!!
For more information, please click or scan below!
Follow us!